Alpine Timber Construction
Directory information score: 16/100
Profile updated May 2, 2026
Alpine Timber Construction is a contractor serving the Colorado Springs, CO community. Reach them at (719) 380-0251. Visit their website to learn more about their work. Located at 2509 Shalimar Dr. Reach them at (719) 380-0251. Visit their website to learn more about their work. Located at 2509 Shalimar Dr.
Directory information score for Alpine Timber Construction
Fixed points summarize recorded information, not service quality. Missing data adds no points and may explain a lower score. Listed credentials and press mentions are not independently verified by this score.
- Public rating
- N/A/5 → 0 / 35 points
- Review Volume
- 0 reviews → 0 / 20 points
- Listed credentials
- None listed → 0 / 5 points
- Listed press mentions
- 0 mentions → 0 / 3 points
- Web Presence
- 10 / 20 points
- Recorded history
- N/A → 0 / 2 points
- Profile information
- 6 / 15 points
Key facts
- Based in
- Colorado Springs, CO
- Address
- 2509 Shalimar Dr
- Website
- http://www.alpinetimberremodeling.com
- Phone
- (719) 380-0251
- Budget tier
- Contact firm
Frequently asked questions
- What services does Alpine Timber Construction offer?
- Alpine Timber Construction's specific services are not yet catalogued in our directory. Contact the firm directly for their current service offerings.
- What is Alpine Timber Construction's typical project cost?
- Cost information for Alpine Timber Construction is not published in our directory. Contact the firm directly at (719) 380-0251 for a project-specific quote.
- Where is Alpine Timber Construction located and what areas do they serve?
- Alpine Timber Construction is based in Colorado Springs, CO. Their broader service area is not published; confirm with the firm before engaging for work outside the metro.
- How do I hire Alpine Timber Construction?
- To hire Alpine Timber Construction: Visit http://www.alpinetimberremodeling.com to review their work, or call (719) 380-0251. Most contractors ask about scope, timeline, and budget range before scheduling an estimate.