Baseline Industrial Construction
Directory information score: 17/100
Profile updated April 18, 2026
A contractor in the heart of Portland, Baseline Industrial Construction is just a phone call away at (503) 287-6722. Learn more on their website.
Directory information score for Baseline Industrial Construction
Fixed points summarize recorded information, not service quality. Missing data adds no points and may explain a lower score. Listed credentials and press mentions are not independently verified by this score.
- Public rating
- N/A/5 → 0 / 35 points
- Review Volume
- 0 reviews → 0 / 20 points
- Listed credentials
- None listed → 0 / 5 points
- Listed press mentions
- 0 mentions → 0 / 3 points
- Web Presence
- 11 / 20 points
- Recorded history
- N/A → 0 / 2 points
- Profile information
- 6 / 15 points
Key facts
- Based in
- Portland, OR
- Address
- 6446 NE Lombard St
- Website
- http://www.baselineindustrialconstruction.com
- Phone
- (503) 287-6722
- admin@baselineindustrialconstruction.com
- Budget tier
- Contact firm
Frequently asked questions
- What services does Baseline Industrial Construction offer?
- Baseline Industrial Construction's specific services are not yet catalogued in our directory. Contact the firm directly for their current service offerings.
- What is Baseline Industrial Construction's typical project cost?
- Cost information for Baseline Industrial Construction is not published in our directory. Contact the firm directly at (503) 287-6722 for a project-specific quote.
- Where is Baseline Industrial Construction located and what areas do they serve?
- Baseline Industrial Construction is based in Portland, OR. Their broader service area is not published; confirm with the firm before engaging for work outside the metro.
- How do I hire Baseline Industrial Construction?
- To hire Baseline Industrial Construction: Visit http://www.baselineindustrialconstruction.com to review their work, or call (503) 287-6722, or email admin@baselineindustrialconstruction.com. Most contractors ask about scope, timeline, and budget range before scheduling an estimate.