SCION EXTERIOR CONSTRUCTION LLC
SCION EXTERIOR CONSTRUCTION LLC is listed in the Oregon Construction Contractors Board Active Licenses roster as a Residential General Contractor (CCB license 216542), with a listed expiration of 2027-08-14. The CCB roster was updated 2026-10-01. The HARP Contractors contact snapshot dated 2026-08-17 lists a phone number and address in NEWBERG, Oregon. These are dated public records; this directory does not rate workmanship or confirm current availability.
Directory information score for SCION EXTERIOR CONSTRUCTION LLC
Fixed points summarize recorded information, not service quality. Missing data adds no points and may explain a lower score. Listed credentials and press mentions are not independently verified by this score.
- Public rating
- N/A/5 → 0 / 35 points
- Review Volume
- 0 reviews → 0 / 20 points
- Listed credentials
- None listed → 0 / 5 points
- Listed press mentions
- 0 mentions → 0 / 3 points
- Web Presence
- 0 / 20 points
- Recorded history
- N/A → 0 / 2 points
- Profile information
- 6 / 15 points
Key facts
- Based in
- NEWBERG, OR
- Address
- 1207 SOUTH PENNINGTON DRIVE
- Phone
- 5038962295
- Budget tier
- Contact firm
- Licensed in
- OR
Frequently asked questions
- What services does SCION EXTERIOR CONSTRUCTION LLC offer?
- SCION EXTERIOR CONSTRUCTION LLC's specific services are not yet catalogued in our directory. Contact the firm directly for their current service offerings.
- What is SCION EXTERIOR CONSTRUCTION LLC's typical project cost?
- Cost information for SCION EXTERIOR CONSTRUCTION LLC is not published in our directory. Contact the firm directly at 5038962295 for a project-specific quote.
- Where is SCION EXTERIOR CONSTRUCTION LLC located and what areas do they serve?
- SCION EXTERIOR CONSTRUCTION LLC is based in NEWBERG, OR and lists licensing in OR. Confirm current standing with the relevant regulator.
- How do I hire SCION EXTERIOR CONSTRUCTION LLC?
- To hire SCION EXTERIOR CONSTRUCTION LLC: call 5038962295. Most contractors ask about scope, timeline, and budget range before scheduling an estimate.