SEAGATE STRUCTURES (USA) INC
Washington State Labor & Industries’ contractor license dataset lists SEAGATE STRUCTURES (USA) INC as a construction contractor with the general-contractor specialty. As observed on 2026-10-02, the dataset listed SEAGASU789NJ (ACTIVE, expires 08/14/2028). Its listed mailing address is 2219 RIMLAND DRIVE, Ste 301, BELLINGHAM, WA 98226, and its listed business phone is 6042406961. L&I describes these as contractor-reported records; the mailing address and phone have not been independently confirmed.
Directory information score for SEAGATE STRUCTURES (USA) INC
Fixed points summarize recorded information, not service quality. Missing data adds no points and may explain a lower score. Listed credentials and press mentions are not independently verified by this score.
- Public rating
- N/A/5 → 0 / 35 points
- Review Volume
- 0 reviews → 0 / 20 points
- Listed credentials
- None listed → 0 / 5 points
- Listed press mentions
- 0 mentions → 0 / 3 points
- Web Presence
- 0 / 20 points
- Recorded history
- N/A → 0 / 2 points
- Profile information
- 6 / 15 points
Key facts
- Based in
- BELLINGHAM, WA
- Address
- 2219 RIMLAND DRIVE, Ste 301
- Phone
- 6042406961
- Budget tier
- Contact firm
- Licensed in
- WA
Frequently asked questions
- What services does SEAGATE STRUCTURES (USA) INC offer?
- SEAGATE STRUCTURES (USA) INC's specific services are not yet catalogued in our directory. Contact the firm directly for their current service offerings.
- What is SEAGATE STRUCTURES (USA) INC's typical project cost?
- Cost information for SEAGATE STRUCTURES (USA) INC is not published in our directory. Contact the firm directly at 6042406961 for a project-specific quote.
- Where is SEAGATE STRUCTURES (USA) INC located and what areas do they serve?
- SEAGATE STRUCTURES (USA) INC is based in BELLINGHAM, WA and lists licensing in WA. Confirm current standing with the relevant regulator.
- How do I hire SEAGATE STRUCTURES (USA) INC?
- To hire SEAGATE STRUCTURES (USA) INC: call 6042406961. Most contractors ask about scope, timeline, and budget range before scheduling an estimate.