TROTSK CONSTRUCTION GROUP LLC
Washington State Labor & Industries’ contractor license dataset lists TROTSK CONSTRUCTION GROUP LLC as a construction contractor with the general-contractor specialty. As observed on 2026-10-02, the dataset listed TROTSCG777N9 (ACTIVE, expires 08/29/2027). Its listed mailing address is 13105 21ST DR SE, A408, EVERETT, WA 98208, and its listed business phone is 4257894569. L&I describes these as contractor-reported records; the mailing address and phone have not been independently confirmed.
Directory information score for TROTSK CONSTRUCTION GROUP LLC
Fixed points summarize recorded information, not service quality. Missing data adds no points and may explain a lower score. Listed credentials and press mentions are not independently verified by this score.
- Public rating
- N/A/5 → 0 / 35 points
- Review Volume
- 0 reviews → 0 / 20 points
- Listed credentials
- None listed → 0 / 5 points
- Listed press mentions
- 0 mentions → 0 / 3 points
- Web Presence
- 0 / 20 points
- Recorded history
- N/A → 0 / 2 points
- Profile information
- 6 / 15 points
Key facts
- Based in
- EVERETT, WA
- Address
- 13105 21ST DR SE, A408
- Phone
- 4257894569
- Budget tier
- Contact firm
- Licensed in
- WA
Frequently asked questions
- What services does TROTSK CONSTRUCTION GROUP LLC offer?
- TROTSK CONSTRUCTION GROUP LLC's specific services are not yet catalogued in our directory. Contact the firm directly for their current service offerings.
- What is TROTSK CONSTRUCTION GROUP LLC's typical project cost?
- Cost information for TROTSK CONSTRUCTION GROUP LLC is not published in our directory. Contact the firm directly at 4257894569 for a project-specific quote.
- Where is TROTSK CONSTRUCTION GROUP LLC located and what areas do they serve?
- TROTSK CONSTRUCTION GROUP LLC is based in EVERETT, WA and lists licensing in WA. Confirm current standing with the relevant regulator.
- How do I hire TROTSK CONSTRUCTION GROUP LLC?
- To hire TROTSK CONSTRUCTION GROUP LLC: call 4257894569. Most contractors ask about scope, timeline, and budget range before scheduling an estimate.