UPPER LEFT CONSTRUCTION LLC

Directory information score: 6/100
Profile updated October 2, 2026

Washington State Labor & Industries’ contractor license dataset lists UPPER LEFT CONSTRUCTION LLC as a construction contractor with the general-contractor specialty. As observed on 2026-10-02, the dataset listed UPPERLC801B1 (ACTIVE, expires 01/21/2028). Its listed mailing address is 13106 NE 33RD CIRCLE, VANCOUVER, WA 98682, and its listed business phone is 3607212140. L&I describes these as contractor-reported records; the mailing address and phone have not been independently confirmed.

Directory information score for UPPER LEFT CONSTRUCTION LLC

Fixed points summarize recorded information, not service quality. Missing data adds no points and may explain a lower score. Listed credentials and press mentions are not independently verified by this score.

Public rating
N/A/5 → 0 / 35 points
Review Volume
0 reviews → 0 / 20 points
Listed credentials
None listed → 0 / 5 points
Listed press mentions
0 mentions → 0 / 3 points
Web Presence
0 / 20 points
Recorded history
N/A → 0 / 2 points
Profile information
6 / 15 points

Key facts

Based in
VANCOUVER, WA
Address
13106 NE 33RD CIRCLE
Phone
3607212140
Budget tier
Contact firm
Licensed in
WA

Frequently asked questions

What services does UPPER LEFT CONSTRUCTION LLC offer?
UPPER LEFT CONSTRUCTION LLC's specific services are not yet catalogued in our directory. Contact the firm directly for their current service offerings.
What is UPPER LEFT CONSTRUCTION LLC's typical project cost?
Cost information for UPPER LEFT CONSTRUCTION LLC is not published in our directory. Contact the firm directly at 3607212140 for a project-specific quote.
Where is UPPER LEFT CONSTRUCTION LLC located and what areas do they serve?
UPPER LEFT CONSTRUCTION LLC is based in VANCOUVER, WA and lists licensing in WA. Confirm current standing with the relevant regulator.
How do I hire UPPER LEFT CONSTRUCTION LLC?
To hire UPPER LEFT CONSTRUCTION LLC: call 3607212140. Most contractors ask about scope, timeline, and budget range before scheduling an estimate.