Wakefield Hardwood Floors
Directory information score: 28/100
HugeDomains.com
Profile updated May 3, 2026
Based in Tampa, Wakefield Hardwood Floors offers professional contracting services across FL. Get in touch at (727) 385-6550 or through their website.
Directory information score for Wakefield Hardwood Floors
Fixed points summarize recorded information, not service quality. Missing data adds no points and may explain a lower score. Listed credentials and press mentions are not independently verified by this score.
- Public rating
- N/A/5 → 0 / 35 points
- Review Volume
- 0 reviews → 0 / 20 points
- Listed credentials
- None listed → 0 / 5 points
- Listed press mentions
- 0 mentions → 0 / 3 points
- Web Presence
- 20 / 20 points
- Recorded history
- N/A → 0 / 2 points
- Profile information
- 8 / 15 points
Key facts
- Based in
- Tampa, FL
- Address
- 4532 W Kennedy Blvd # 273
- Website
- https://www.hugedomains.com/domain_profile.cfm?d=buccaneerhardwood&e=com
- Phone
- (727) 385-6550
- wakefield.floors@hugedomains.com
- Budget tier
- Contact firm
Frequently asked questions
- What services does Wakefield Hardwood Floors offer?
- Wakefield Hardwood Floors's specific services are not yet catalogued in our directory. Contact the firm directly for their current service offerings.
- What is Wakefield Hardwood Floors's typical project cost?
- Cost information for Wakefield Hardwood Floors is not published in our directory. Contact the firm directly at (727) 385-6550 for a project-specific quote.
- Where is Wakefield Hardwood Floors located and what areas do they serve?
- Wakefield Hardwood Floors is based in Tampa, FL. Their broader service area is not published; confirm with the firm before engaging for work outside the metro.
- How do I hire Wakefield Hardwood Floors?
- To hire Wakefield Hardwood Floors: Visit https://www.hugedomains.com/domain_profile.cfm?d=buccaneerhardwood&e=com to review their work, or call (727) 385-6550, or email wakefield.floors@hugedomains.com. Most contractors ask about scope, timeline, and budget range before scheduling an estimate.