WEST COAST RACKING SYSTEMS LLC
Washington State Labor & Industries’ contractor license dataset lists WEST COAST RACKING SYSTEMS LLC as a construction contractor with the general-contractor specialty. As observed on 2026-10-02, the dataset listed WESTCCR818JP (ACTIVE, expires 04/24/2027). Its listed mailing address is 6819 Desperado DR SE, Tumwater, WA 98501, and its listed business phone is 3605006932. L&I describes these as contractor-reported records; the mailing address and phone have not been independently confirmed.
Directory information score for WEST COAST RACKING SYSTEMS LLC
Fixed points summarize recorded information, not service quality. Missing data adds no points and may explain a lower score. Listed credentials and press mentions are not independently verified by this score.
- Public rating
- N/A/5 → 0 / 35 points
- Review Volume
- 0 reviews → 0 / 20 points
- Listed credentials
- None listed → 0 / 5 points
- Listed press mentions
- 0 mentions → 0 / 3 points
- Web Presence
- 0 / 20 points
- Recorded history
- N/A → 0 / 2 points
- Profile information
- 6 / 15 points
Key facts
- Based in
- Tumwater, WA
- Address
- 6819 Desperado DR SE
- Phone
- 3605006932
- Budget tier
- Contact firm
- Licensed in
- WA
Frequently asked questions
- What services does WEST COAST RACKING SYSTEMS LLC offer?
- WEST COAST RACKING SYSTEMS LLC's specific services are not yet catalogued in our directory. Contact the firm directly for their current service offerings.
- What is WEST COAST RACKING SYSTEMS LLC's typical project cost?
- Cost information for WEST COAST RACKING SYSTEMS LLC is not published in our directory. Contact the firm directly at 3605006932 for a project-specific quote.
- Where is WEST COAST RACKING SYSTEMS LLC located and what areas do they serve?
- WEST COAST RACKING SYSTEMS LLC is based in Tumwater, WA and lists licensing in WA. Confirm current standing with the relevant regulator.
- How do I hire WEST COAST RACKING SYSTEMS LLC?
- To hire WEST COAST RACKING SYSTEMS LLC: call 3605006932. Most contractors ask about scope, timeline, and budget range before scheduling an estimate.